Included
- Installation of a Level 2 hardwire charging station (which you provide) or a NEMA 14-50 outlet to be used with a Level 2 charging cord (may be included with your vehicle) – plus labor and materials
- Main panel load calculation to assess available capacity1
- Permitting and inspection fees (where required, additional fees apply and will be added to final quote)2
- Create and submit permit documents (as required by local jurisdiction)
- Provide and install code-compliant electrical wiring and protective tubing
- Provide and install a new, properly sized breaker in panel
- Power up your charging unit and test for proper operation
- 1-Year warranty on parts and labor
1Qmerit can upgrade your panel to provide sufficient capacity for EV charging and future-proof your home to accommodate additional electrification technologies down the road.
2Customer remains responsible for (a) payment of all applicable fees related to required permits, and (b) confirming the installer has applied for and been issued all necessary permits.
Not included
- Level 2 charging station, this will need to be purchased by you ahead of your scheduled installation. Need a Level 2 charging station? Shop Level 2 Charging Stations here.
- Drywall, stucco, plaster, concrete or any other repairs to walls, ceilings or floors if penetration is required for wiring runs
- Any trenching required if your garage is detached